New roof installation

A new roof for a house, addition or garage, including the deck preparation, covering and connections around it.

When you need it

Signs it is time

  • You're building a house, addition, detached garage or accessory dwelling unit.
  • An addition needs to join the existing roof without leaving gaps at the connection.
  • The roof's supporting boards have widespread rot, moisture damage or fire damage.
  • You're changing a low roof to a pitched design and need the framing and drainage planned together.

What we do

How we do the work

A new roof may be part of a new home, an addition or a rebuild where the old deck is no longer sound. We start with what will support it: the framing, the sheathing and the connections to any existing roof. The plan also needs to account for ventilation and drainage. Where will attic air enter and leave? Where will the roof send rain, and can the gutters carry it? Those details belong in the plan before the covering is installed. We'll explain the layers being fitted and the work needed at each edge, valley and roof opening.

1

Measure on site

We confirm the dimensions at the house, not from satellite images alone.

2

Prepare the deck

The sheathing and its fixings provide the base for the new roof.

3

Protect valleys and edges

We fit the water barrier where the roof design requires it.

4

Lay the underlayment

This layer covers the deck beneath the finished roofing.

5

Fit the flashing

Drip edge, valley metal and wall details direct runoff past the connections.

6

Install the covering

Shingles, tiles or metal panels are fitted to the manufacturer's requirements.

7

Arrange inspections

We handle the required permits and city or county inspection for the job.

8

Finish and clear up

We sweep for loose nails and walk through the completed work with you.

The work

A covering going down

A roofer walking a deck part way through a re-roof, underlayment laid and the old tile stacked to one side.
Underlayment down, the old covering stacked and going.
Standing-seam metal panels part way down a low-slope roof, with tools resting on the finished pan.
Standing-seam panels going down a pan at a time.

Options

What you can choose

Asphalt shingles

Architectural shingles create a layered appearance on a pitched roof. We discuss the available finish alongside the roof's slope, support and wind exposure.

Tile

Concrete or clay tile has a distinctive shape and adds weight to the roof. Its suitability needs to be checked against the structure as well as the appearance you want.

Metal

Standing-seam panels give a roof long, clean lines. The pitch and connections around the edges need to suit the selected metal system.

Flat torch-down

Torch-down uses layers of modified-bitumen membrane on suitable low-slope areas. It can be considered for roof sections, patio covers and balconies that need this type of covering.

How long it takes

How long it takes, and what is covered

The written estimate carries the dates. The roof is dried in at the end of every working day, so the house is never left open overnight.

  • 10 yearsWorkmanship on new installs
  • one to five years depending on scopeOn repairs, by scope

Questions

Questions about new roof installation

How do you decide what the deck needs?

We can assess the sheathing fully once the framing or old roof covering is exposed. We look for rot, sagging and boards that no longer provide a sound base. Damaged sections are removed back to the supporting rafters and replaced with suitable plywood. Deck repairs are itemized with unit pricing, so you can see what was replaced and how that work is charged.

Which material suits my house?

The roof's slope and structure narrow the choices before appearance comes into it. Concrete tile adds weight that the framing must be able to carry. Shingles, metal and low-slope roofing each need a suitable pitch and installation detail. We look at the framing, discuss the style of your house and review samples with you during the estimate, so the choice fits both the building and your preferences.

What about the join where an addition meets the old roof?

That connection needs its own flashing detail. Where a roof meets a wall, we fit overlapping metal pieces into the shingle courses and cover the upper edges at the siding or masonry. At the lower end, a kick-out flashing directs runoff toward the gutter instead of behind the wall covering. We plan these connections as part of the addition, because the new roof has to work with the old one.

Related

Other roofing problems

Service

Re-roofing

We remove the old covering, inspect the deck and rebuild the roof over a sound base.

Service

Roof leak repair

We trace where rain gets into the roof and explain the repair needed at its source.

Overview

Roofing

New roofs, re-roofs, leak repairs and inspections in asphalt, tile, metal and flat torch-down.

Free estimate

Find out what it costs

Tell us what's happening at your property, one step at a time. We'll review your request during business hours and arrange a free inspection.

What happens after you send it

  • We call during business hours to set a time.
  • A free visit. We measure on site and nothing is signed at the door.
  • The proposed work and the price, in writing.

Sat by appointment · Sun closed

100 Example Road, Brentwood, CA 94513 · office@example-roofing.demo

Free estimateExpand

Loading the form…

The online form is not loading. Use the short form below, or call the office and we will take the details over the phone.

Your property answers are saved in this browser as you go. About saved answers.

Having trouble? Use the short form

Your details

How we handle your information

Thanks. We will call during business hours to set up the inspection.

(925) 555-0100

Property answers are saved in this browser as you go. Privacy and saved answers (new tab).